After students finished Spring Semester 2017, Technology Infrastructure and Operations team went into Drown Hall to perform a wireless assessment to develop a plan for providing complete wireless coverage. Data from the assessment in May was used to strategically place Access Points (APs) throughout the building to provide optimal wireless coverage and performance. Working with Dawn Keetley, Professor of English and Chair of the English Department, we scheduled the installation of pathway and wireless APs during the summer in preparation for the upcoming academic school year. The project was completed at the beginning of August with 33 new APs and one new building access switch installed. We are excited to bring a much needed wireless upgrades for the English department and students that use Drown Hall for academics and research.